T07
Factory Operations
Factory Operations: 5 courses and 25 lessons on ATMA. Every lesson is free to read, with an Excel template for each course.
T07-C01 How a Garment Factory Works
- The main departments and workflow inside a garment factory, in the order work actually moves
- Line balancing and how a factory matches its output to a target quantity and deadline
- Capacity planning: how a factory decides how many orders it can accept
- Common production bottlenecks and how a factory identifies where work is piling up
- Reading a factory's own production report to see where an order stands
T07-C02 Cutting Room Operations
- What happens in a cutting room, from fabric relaxation to bundled cut pieces
- Marker making and fabric utilisation, and why the wastage percentage matters
- Spreading and cutting methods and the quality faults each one risks
- Cutting-room-specific quality faults and how to inspect for them
- Building a complete cutting room checklist for a production order
T07-C03 Sewing Floor Operations
- How a sewing line breaks a garment into operations and organises operators around them, from a straight line to a modular team
- Operation breakdown and standard minute value, and how they set a line's output target
- Work-in-progress tracking and how a supervisor sees where an order is stuck
- Sewing-floor-specific quality faults and how to inspect for them
- Tracking a complete sewing order from line start to line closure
T07-C04 Finishing, Pressing and Packing
- What happens after sewing: finishing, pressing and packing as separate stages
- Pressing methods and the fabric-specific risks each one carries
- Packing formats and how a buyer's packing instruction changes the final carton
- Finishing-and-packing-specific quality faults and how to inspect for them
- Building a complete finishing and packing checklist for a shipment
T07-C05 Lean and Continuous Improvement
- What Lean means on a garment factory floor, in plain operational terms
- The seven classic wastes and how each one shows up in a garment factory
- Kaizen and small continuous-improvement cycles versus one-off large projects
- Tracking a single improvement idea from identification to a measured before/after result
- Building a complete continuous-improvement tracker for a factory floor
Every lesson is free to read.
‹ Previous track: Product Categories · Next track: Industrial Engineering and Machinery › · All tracks