T08
Industrial Engineering and Machinery
Industrial Engineering and Machinery: 6 courses and 27 lessons on ATMA. Every lesson is free to read, with an Excel template for each course.
T08-C01 Work Study and SMV
- What work study measures and why a factory needs it beyond a stopwatch guess
- Time study methods: stopwatch, rated observation and allowance, and how they combine into an SMV
- Building a full SMV table for a garment's complete operation sequence
- Predetermined motion time systems and when a factory uses them instead of direct time study
- Auditing an existing SMV table for errors before trusting it for costing or planning
T08-C02 Capacity Planning
- Calculating a line's daily capacity from its SMV table and available minutes
- Efficiency and utilisation: the two percentages that separate theoretical from actual capacity
- Building a capacity booking sheet across multiple lines and multiple orders
- What happens when a factory overbooks its own capacity
- Building a complete capacity plan for a new order before confirming its delivery date
T08-C03 Line Balancing and Bottlenecks
- Reading a line-balancing chart to see where operator workload is uneven
- Splitting, combining and re-sequencing operations to balance a line
- Calculating balancing loss and what a factory can realistically recover
- Diagnosing a bottleneck's root cause before assigning it a fix
- Building a complete line-balancing worksheet for a real operation sequence
T08-C04 Garment Production Machinery
- The main machine families on a garment production floor and what each one does
- Stitch classes and seam types and which machine produces each one
- Choosing the right machine for a given operation and fabric
- Machine faults that come from the wrong machine choice, not operator error
T08-C05 Textile and Specialised Machinery
- The main machine families in spinning, weaving and knitting mills
- Specialised machinery for socks, hosiery and terry or towel production
- How mill machinery choices shape what a garment factory can source
- Choosing between mill machinery options for a given fabric or product family
T08-C06 Machinery Investment and Maintenance
- Calculating the payback period on a new machine investment
- Preventive versus breakdown maintenance and their real cost difference
- Building a machine maintenance schedule and tracking its own cost
- Deciding whether to invest in new machinery or maintain existing machines longer
Every lesson is free to read.
‹ Previous track: Factory Operations · Next track: Quality › · All tracks