Course contents
Foundation · Course 7: Money in the Apparel Business · Lesson 4 of 5

Payment terms and cash flow: how and when money moves between buyer and factory

Level: FoundationTime: 45 minutesOrder used: A (contrasted with a Cedar & Co. domestic order of the same value)Tool: Costing sheet
This lesson is for anyone who prices or plans cash for a garment order: a merchandiser, factory owner, finance clerk, buyer, or student. Earlier Course 7 lessons are useful but not required. Figures are teaching examples in US dollars; at work, use your own order's real values.
FactoryDelta Garments
Export orderOrder A, Northline Apparel, 15,000 T-shirts, letter of credit
Domestic orderEquivalent-value order for Cedar & Co., 60-day open account
Order value (both)USD 48,000 (15,000 × USD 3.20)
Payment triggerShipment, or 60 days after delivery
What differsNot the price — when it turns into cash
02Opening

This page explains why two orders of the same value can leave a factory waiting very different lengths of time to be paid

This lesson is for a merchandiser, a factory owner, or a finance clerk who needs to know not just how much an order is worth, but when that value actually becomes cash the factory can spend. At work, a factory reads a costing sheet and sees one number: the FOB price. That number tells the factory how much money the order is worth. It does not tell the factory when that money arrives in its bank account, and the gap between finishing the goods and being paid is a real cost, separate from the price itself.

Delta Garments currently runs two orders side by side. One is Order A, its regular export order for Northline Apparel, paid by letter of credit at shipment. The other is a domestic order of the same value for Cedar & Co., paid on 60-day open account. Without this skill, a merchandiser looking only at price would treat these two orders as equally good for the factory's cash position. They are not. This lesson teaches you to read payment terms as carefully as you read price, and to work out how long an order actually ties up a factory's cash.

03Before you start

What you need, and what this lesson does not cover

You need: the idea of a costing sheet's total price from lesson 7.2. You do not need to know how interest or bank finance is calculated.

By the end of this lesson you can:

  • explain why the FOB price on a costing sheet does not say when a factory is paid;
  • name the common payment terms a factory meets and say which ties up cash longest;
  • work out the number of days between finishing production and receiving payment for a given payment term;
  • compare the cash-flow gap of two orders of similar value but different payment terms;
  • avoid assuming that a higher-priced order is automatically the better order for cash flow.

Not covered here: how the FOB price itself is built (lesson 7.2), how margin and markup are calculated (lesson 7.3), and where profit across the whole chain is made or lost (lesson 7.5).

04Key terms

Words you will meet in this lesson

TermMeaning
Payment termsThe part of a purchase order stating when and how the factory is paid, for example letter of credit at shipment or open account.
Letter of creditA bank promise to pay the factory once the shipping documents match the order.
Open accountA payment method where the buyer pays the factory an agreed number of days after delivery, with no bank guarantee in between.
DepositA partial payment made before an order is finished. The rest, the balance, is usually paid on shipment.
Cash on deliveryPayment made at or very near the moment the goods are physically delivered to the buyer.
Cash flowThe movement of money into and out of a business over time, separate from how much an order is worth on paper.
Cash-flow gapThe length of time between a factory finishing production and actually receiving payment for that production.
Working capitalThe money a business needs on hand to keep operating — paying workers and suppliers — while it waits to be paid for goods already made.
05Teaching
The rule

A costing sheet's price says how much money changes hands; payment terms say when

Every costing sheet ends in one number: the FOB price, what the buyer pays the factory per piece. That price answers only one question — how much. It does not answer a second, equally important question — when. Payment terms answer that second question. They fix the point in the order's life at which the buyer's money is due, and therefore the length of time between the factory finishing the goods and the factory actually holding the payment. That gap is a real cash-flow cost a factory must plan for, on top of, and separate from, the price itself.

Finish productionShip or deliverthe goodsPayment term'strigger point is metCash arrives inthe factory's account
Four steps stand between finishing goods and holding cash. Payment terms decide how long step three to step four takes; the price never changes this length.
What you meet in real life

The same price can sit behind very different waiting times

A factory rarely meets only one payment term across its customers. The term itself, not the price, decides how long the factory's money is tied up.

What can differThe shapes you will meetWhy it matters
Trigger point of paymentLetter of credit at shipment: the buyer's bank pays once shipping documents match the order, at or shortly after the goods leave the factory.Money arrives close to the point of shipment; the wait is close to the production timeline itself.
Delay after deliveryOpen account: the factory ships or delivers first and waits an agreed number of days, commonly 30, 60 or 90, before payment.Each extra day of waiting is a day the factory's cash from this order stays unavailable.
Payment split across the orderDeposit plus balance: part of the price is paid before production starts, the rest on shipment.Reduces the factory's cash-flow exposure compared with the full price arriving only at shipment.
Timing relative to physical deliveryCash on delivery: payment happens at or very near the moment the goods physically reach the buyer.The shortest cash-flow gap of the common terms, but least common for export orders that cross a border.

None of these terms is wrong. A new brand with little history may only be trusted with cash on delivery; an established buyer with a long relationship may be extended 60 or 90 days open account. What a merchandiser must never do is assume a term from the price alone; the payment terms are written in the purchase order and must be read on their own.

The case we follow

Delta Garments runs an export order and a domestic order of the same value, on very different payment terms

Delta Garments currently makes two orders of similar total value at the same time. The first is Order A, its export order for Northline Apparel: 15,000 basic cotton T-shirts at a FOB price of USD 3.20 each, paid by letter of credit at shipment. The second is a domestic order, of equivalent value, for Cedar & Co., the local brand that buys from Delta Garments on a fixed 60-day open account. Cedar & Co.'s order is the one this lesson follows in detail, because it is the shape that most clearly shows a cash-flow gap that price alone would hide: the same size of order as Order A, but with 60 extra days of waiting built into its payment terms.

OrderBuyerOrder value (equivalent)Payment termsCash arrives
Order ANorthline Apparel (export)USD 48,000Letter of credit at shipmentAt or shortly after shipment
Domestic orderCedar & Co.USD 48,000 (equivalent value)60-day open account60 days after delivery

Both orders show the same price on their costing sheets. Only the payment terms tell Delta Garments which one keeps its cash tied up longer.

The worked number

The same order value, tied up for very different numbers of days

Order A's own order value is the amount at stake: 15,000 pieces at USD 3.20 each.

15,000 × 3.20 = USD 48,000

Order A's production period, from Order A's own timeline, runs from approvals through inspection and documents, before the goods ship: 2 weeks of approvals, 5 weeks of fabric, 2 weeks of sewing, and 1 week of inspection, packing and documents.

2 + 5 = 7
7 + 2 = 9
9 + 1 = 10 weeks

Ten weeks is 70 days.

10 × 7 = 70 days

Under a letter of credit paid at shipment, Delta Garments' USD 48,000 is tied up for close to this 70-day production period only; payment follows shipment closely. Under a 60-day open account on an equivalent-value domestic order, the same USD 48,000-scale amount is tied up for the 70-day production period plus a further 60 days after delivery.

70 + 60 = 130 days
Days from finishing production to cash in hand Production period (same for both orders) 70 days Extra wait under a 60-day open account 60 days
The 60-day open account nearly doubles the wait. Both orders share the same 70-day production period; only the domestic order's payment terms add a further 60 days before cash arrives.
The method

Four steps to assess any payment term's cash-flow impact

  1. Identify the order's total value. Multiply quantity by price, as on the costing sheet.
  2. Identify the payment term's trigger point. Ask whether payment is due at shipment, at delivery, or a fixed number of days after one of those.
  3. Estimate the total days between finishing production and receiving payment. Add the production period to any waiting period the payment term adds.
  4. Compare that gap across orders of similar value. The order with the longer gap ties up the factory's cash for longer, whatever its price looks like.
The trap

A common mistake is assuming a higher price always means better cash flow

A common mistake is assuming a higher FOB price always means better cash flow for a factory. A high-priced order paid on 90-day open account can tie up more cash for longer than a lower-priced order paid by letter of credit at shipment. Price and payment timing are two separate variables, and a merchandiser must check both, never one instead of the other. What it costs to get this wrong is real: a factory that plans its cash only from price can be short of working capital exactly when it needs to pay its own suppliers and workers for the next order.

06In plain words

A costing sheet's price tells a factory how much money an order is worth. It does not tell the factory when that money arrives — the payment terms do that. A letter of credit paid at shipment brings the money in close to when the goods leave. A 60-day open account makes the factory wait a further two months after delivery before the same money arrives. A deposit paid before production, or cash paid on delivery, changes the wait again. Two orders can be worth exactly the same money and still tie up a factory's cash for very different lengths of time. A higher price is not automatically better if the wait for payment is much longer. Always check the price and the payment terms together, never the price alone.

07Quick check
  • The FOB price says how much; the payment terms say when. Read both.
  • Letter of credit at shipment usually brings cash in close to the production timeline itself.
  • Open account commonly adds 30, 60 or 90 further days of waiting after delivery.
  • A deposit before production, or cash on delivery, shortens the cash-flow gap compared with full payment held back to shipment or later.
  • Compare orders by total value tied up and days waited, not by price alone.
  • A cash-flow gap that is not planned for can force a factory to borrow, or to delay taking on its next order.
08Workplace scenario

Karim is asked to choose between two new orders of similar total value but different payment terms

Delta Garments has room for one more order this season, and two offers have come in of similar total value. The first order carries a slightly higher FOB price and is paid on 45-day open account. The second carries a slightly lower FOB price and is paid by letter of credit at shipment. Karim, the production manager, is asked which order is better for Delta Garments' cash flow.

  • Both orders are of similar total value.
  • The first order's price is slightly higher, but payment arrives only 45 days after delivery.
  • The second order's price is slightly lower, but payment arrives at or shortly after shipment, under a letter of credit.
  • Delta Garments' own cash position, and how soon it needs cash for its next order, is not stated in either offer.

Is the higher-priced order automatically the better choice for Delta Garments' cash flow? Decide before opening the answer.

Show decision

Not automatically. Two facts decide this together, not the price alone.

First, the payment terms. The higher-priced order's 45-day open account means Delta Garments waits significantly longer to be paid than the lower-priced order's letter-of-credit-at-shipment terms. Forty-five extra days of waiting is a real cash-flow cost, even though it does not appear on either costing sheet.

Second, Delta Garments' own cash position. If Delta Garments' cash is tight and it needs money soon for its next order, the lower-priced but faster-paying order could be the better choice overall, even though it earns slightly less per piece. If Delta Garments has spare cash and can comfortably wait, the higher price may still be worth taking.

Neither fact decides this alone. Price without payment terms hides the wait; payment terms without a look at Delta Garments' own cash position cannot say which order actually suits it best right now.

09What it costs

What a cash-flow gap costs a factory, beyond the price itself

Using Order A's own order value as the amount at stake: USD 48,000 tied up for 70 days under a letter of credit at shipment, against the same USD 48,000-scale amount tied up for 130 days under a 60-day open account on an equivalent-value domestic order.

130 - 70 = 60 extra days

For comparison, Order A's own profit is a small share of that value at risk: USD 0.26 profit per piece.

0.26 × 15,000 = USD 3,900

The order's entire profit of USD 3,900 is far smaller than the USD 48,000 tied up while waiting to be paid. A factory whose cash is tied up for those extra 60 days may need to borrow working capital to cover the gap, which costs interest, or may be unable to take on its next order until this one is paid. This is a real cost that a costing sheet's price-only view does not capture, which is exactly why payment terms must be assessed alongside price, never instead of it.

10Working template

Costing sheet: read the total price alongside how long it takes to become cash

Open the course workbook's Costing sheet. Its "Total (FOB price)" row shows Order A's fixed FOB price, USD 3.20, built from fabric, trims, making, overhead and profit. That price is only half the picture for cash planning.

Next to the total price cell, write a note on how long each payment term takes to turn that price into cash in hand. For Order A's own terms, letter of credit at shipment, cash arrives close to the 70-day production period itself. For a 60-day open account, such as Cedar & Co.'s domestic order, cash arrives about 130 days after finishing production, once the 60-day wait after delivery is added. Do this for every order: the price cell says how much; your note says when.

Download the Costing sheet (Excel)

11Check yourself

1. What does the FOB price on a costing sheet tell a factory, and what does it not tell it?

2. Which of Delta Garments' two payment terms in this lesson typically ties up cash longer: letter of credit at shipment, or 60-day open account?

3. A factory ships a 5,000-piece order and is paid on 90-day open account. Compared with an order of the same value paid by letter of credit at shipment, what happens to the factory's cash-flow gap?

12Glossary
ENARFRTRMeaning
Payment termsشروط الدفعConditions de paiementÖdeme şartlarıThe part of a purchase order stating when and how the factory is paid, for example letter of credit at shipment or open account.
Letter of creditاعتماد مستنديLettre de créditAkreditifA bank promise to pay the factory once the shipping documents match the order.
Open accountحساب مفتوحCompte ouvertAçık hesapA payment method where the buyer pays the factory an agreed number of days after delivery, with no bank guarantee in between.
Depositدفعة مقدمةAcompteKaporaA partial payment made before an order is finished. Does not usually transfer ownership of the whole order by itself.
Cash on deliveryالدفع عند التسليمPaiement à la livraisonTeslimatta ödemePayment made at or very near the moment the goods are physically delivered to the buyer.
Cash flowالتدفق النقديTrésorerieNakit akışıThe movement of money into and out of a business over time, separate from how much an order is worth on paper.
Cash-flow gapفجوة التدفق النقديÉcart de trésorerieNakit akışı açığıThe length of time between a factory finishing production and actually receiving payment for that production.
Working capitalرأس المال العاملFonds de roulementİşletme sermayesiThe money a business needs on hand to keep operating while it waits to be paid for goods already made.
13Next

Lesson 7.5: Where profit is made and lost across the value chain

You now separate an order's price from when that price is actually paid. The next lesson takes the whole value chain, from mill to shop, and compares where each company's profit is made, and where it is lost. Back to the course map

14Ladder

RecognizeTell a price figure apart from a payment term.
ConnectSee how a payment term's trigger point sets the length of the cash-flow gap.
CompareWeigh a higher price against slower payment terms, and a lower price against faster ones.
DecideChoose between two orders of similar value using both price and payment terms together.