This page teaches a merchandiser how to read a buyer's enquiry and work out exactly what it asks for, before any price is built. This lesson mainly teaches information: what an enquiry contains, what it leaves out, and how to turn a loose message into a clear, answerable list. At work, an enquiry rarely arrives as a finished specification. A buyer sends a message with some facts filled in and others left blank, and asks for a price. A factory that costs before reading the enquiry properly ends up quoting the wrong product or quantity.
Delta Garments receives enquiries from several kinds of buyer, export and domestic, new and established. Northline Apparel, an export buyer with its own shops, sends a new-season enquiry for a basic cotton T-shirt: a short message naming the product, a rough quantity, and little else. Mona, the merchandiser, cannot cost this yet. She reads the enquiry line by line, marks what is stated and what is missing, and turns the gaps into specific questions Northline Apparel can answer quickly. This lesson teaches that reading skill, since every quotation later in this course depends on getting it right first.
You need: no earlier lesson. General familiarity with a purchase order's usual contents, covered in Track 1, is useful but not required.
By the end of this lesson you can:
Not covered here: turning the read enquiry into a costed price (lesson 1.2); setting the quotation's own validity, MOQ and lead time (lesson 1.3); presenting the finished quotation and answering the buyer's first questions (lesson 1.4); tracking many enquiries at once across a full order book (lesson 1.5).
| Term | Meaning |
|---|---|
| Enquiry | A buyer's first message asking a factory for a price and terms on a product, sent before any order is confirmed. |
| Specification | The full, exact description of a product: fabric, construction, sizes, colours and quantity, needed before a firm price can be given. |
| Request for quotation (RFQ) | Request for quotation; a formal version of an enquiry, often a form or spreadsheet, asking several factories for a comparable price on the same product. |
| Firm enquiry | An enquiry with a real order behind it, where the buyer intends to place the order once a suitable quotation is received. |
| General price check | An enquiry sent only to learn roughly what a product costs, with no order intended in the near term. |
| Clarifying question | A specific question sent back to the buyer to fill a gap in the enquiry, aimed at one missing fact rather than the whole specification. |
An enquiry can only be turned into a real price once three things are known: what product is being asked for, roughly how many pieces, and roughly when the buyer needs them. A factory that starts costing before all three are confirmed is not quoting the buyer's actual order; it is quoting its own guess of what the buyer meant. Reading an enquiry is the work of checking these three things against what the message actually says, not against what a similar past order looked like.
| What can differ | The shapes you will meet | Why it matters |
|---|---|---|
| Export, new buyer, first contact | A new export buyer, such as a brand entering the market for the first time, sends a short message naming a product and a rough quantity range, with sizes, fabric detail and delivery date left open. | Nothing here is confirmed; every gap must become a clarifying question before costing starts, since there is no order history to fill the gaps from. |
| Export, established buyer, new style | Northline Apparel, an established buyer, sends an enquiry for a new-season style close to a product it has ordered before, naming quantity and target delivery month but leaving exact GSM and size ratio to be confirmed. | Some facts can reasonably be carried over from the buyer's past orders, but the merchandiser still checks each one rather than assuming it is unchanged. |
| Domestic, formal RFQ | A domestic brand sends a formal RFQ spreadsheet with fixed columns, asking several factories to fill in a price against the same stated specification. | The specification is already complete; the factory's job is reading it accurately, not asking for missing facts, and answering every column asked for. |
| General price check, no real order | A buyer asks "roughly what would a basic T-shirt cost in 5,000 pieces" with no delivery date and no confirmed fabric, often to compare a new market against an existing supplier. | The factory should recognise this as a rough estimate stage, not a firm quotation, and can answer with a range rather than a full costed quotation. |
Northline Apparel sends Delta Garments a short enquiry for its next season: "Basic cotton T-shirt, similar to our usual style, about 15,000 pieces, need pricing for a new-season order." The message names the product family and a rough quantity, close to Order A's own fixed 15,000 pieces, but it does not state the exact GSM, the size ratio, or the delivery week. Mona reads the enquiry against what a complete specification needs and marks three gaps: the exact fabric weight, the size breakdown, and the target delivery date.
| Fact needed | Stated in the enquiry | Confirmed by Mona's question |
|---|---|---|
| Product | Basic cotton T-shirt | Single jersey, 180 GSM, Ne 30/1 combed cotton |
| Quantity | About 15,000 pieces | 15,000 pieces, sizes S M L XL, ratio 1:2:2:1 |
| Timing | Not stated | Delivery needed by week 16 from order confirmation |
Once Mona's three questions are answered, the enquiry becomes a full specification matching Order A's own fixed figures, and only then does lesson 1.2 begin building a costed quotation from it.
The worked numberMona checks the enquiry against a short list of five facts a complete specification needs: product, fabric weight, size ratio, quantity, and delivery date.
A common mistake is filling a gap in the enquiry with an assumption carried over from a past order, rather than asking the buyer to confirm it. Northline Apparel's new-season enquiry looks similar to Order A, so it is tempting to assume the same 180 GSM fabric and the same 1:2:2:1 size ratio without asking. A new season sometimes does carry a small change: a slightly heavier fabric, a different size ratio, or an earlier delivery week than the previous order.
This mistake costs real time and money when it goes unnoticed. A quotation built on an assumed specification that turns out to be wrong has to be redone from the costing stage onward, once the buyer points out the mismatch, delaying the whole enquiry by the days it takes to requote. Asking one short, specific question at the reading stage costs Mona a few minutes; reworking a wrong quotation later costs the days it takes to notice the error, requote, and resend.
A buyer's enquiry is the first message asking a factory for a price. It rarely states everything the factory needs. Before any price can be built, three things must be clear: what the product is, roughly how many pieces, and roughly when the buyer needs them. A merchandiser reads the enquiry, marks what it says and what it leaves out, and turns every gap into one clear question sent back to the buyer. Only once those questions are answered does the enquiry become a full specification ready for costing. Skipping this step and guessing at the missing facts leads to a wrong quotation that has to be redone later.
Northline Apparel sends Delta Garments its new-season enquiry: "Basic cotton T-shirt, similar to our usual style, about 15,000 pieces, need pricing for a new-season order." No exact fabric weight, size ratio, or delivery date is stated anywhere in the message.
Should Mona cost the enquiry now using Order A's own fixed 15,000 pieces and 180 GSM fabric, or should she send clarifying questions first? Decide before opening the answer.
She should send clarifying questions first, even though Northline Apparel is an established buyer. "About 15,000 pieces" is not a confirmed quantity, and no fabric weight, size ratio or delivery date is stated at all.
First, an established buyer's history is a useful starting point, but it is not a substitute for confirming the current enquiry's own facts; a new season can carry real changes even from a trusted buyer.
Second, quoting a price against an assumed 180 GSM fabric and an assumed 15,000-piece quantity risks a wrong quotation if Northline Apparel actually needs a different weight or a firmer 14,200 or 15,800 pieces, forcing a rework once the mismatch is found and costing several days of delay on a new-season timeline that is often already tight.
Using Order A's own fixed scale, 15,000 pieces at a FOB of USD 3.20, the order is worth USD 48,000.
If Mona quotes this full order against a guessed specification and Northline Apparel later confirms a different fabric weight or size ratio, the whole quotation has to be recosted from the fabric price and marker figures onward, a rework that typically costs two to three working days on a new-season timeline.
Sending clarifying questions at the reading stage costs Mona only the time it takes Northline Apparel to reply, usually a day or less, and protects the whole USD 48,000 quotation from being built on a guess that turns out wrong.
Open the course workbook's Enquiry Log sheet. For each new enquiry, enter what the buyer's message states for product, quantity and timing, mark which of these three are missing, and record the clarifying question sent for each gap.
Download the full working sheet, with Northline Apparel's enquiry already filled in, from the link on this course's page.
1. What three facts must a factory confirm before an enquiry can be costed?
2. Northline Apparel's enquiry says 'about 15,000 pieces' with no exact fabric weight stated. What should Mona do?
3. A domestic buyer sends a formal RFQ spreadsheet with every column already filled in. What is Mona's main task with this enquiry?
| EN | AR | FR | TR | Meaning |
|---|---|---|---|---|
| Enquiry | استفسار | Demande de prix | Fiyat talebi | A buyer's first message asking a factory for a price and terms on a product, sent before any order is confirmed. |
| Specification | المواصفات | Spécification | Spesifikasyon | The full, exact description of a product: fabric, construction, sizes, colours and quantity, needed before a firm price can be given. |
| Request for quotation (RFQ) | طلب عرض سعر (RFQ) | Demande de devis (RFQ) | Teklif talebi (RFQ) | Request for quotation; a formal version of an enquiry, often a form or spreadsheet, asking several factories for a comparable price on the same product. |
| Firm enquiry | استفسار جاد | Demande ferme | Kesin talep | An enquiry with a real order behind it, where the buyer intends to place the order once a suitable quotation is received. |
| General price check | استعلام سعر عام | Vérification de prix générale | Genel fiyat sorgusu | An enquiry sent only to learn roughly what a product costs, with no order intended in the near term. |