Course contents
Practitioner · Course 5: Tech Packs and Costable Specifications · Lesson 1 of 5

What a tech pack is and why every order needs one

Level: PractitionerTime: 45 minutesOrder used: A (the T-shirt)Tool: Tech pack template pack
This lesson is for anyone who receives, checks or assembles a tech pack: a merchandiser, a pattern maker, a costing clerk, or a new entrant to the trade. It is the first lesson of this course; no earlier lesson is needed. Figures are teaching examples from Order A. At work, use your own order's actual tech pack.
BuyerNorthline Apparel (overseas clothing brand)
FactoryDelta Garments (garment factory)
DepartmentMerchandising team (Delta Garments)
FabricSingle jersey, 180 GSM, Ne 30/1 combed cotton
FOB priceUSD 3.20 per piece
Quantity15,000 pieces
02Opening

This page explains what a tech pack is and why a factory cannot accurately quote or produce an order without one

This page explains what a tech pack is and why a factory cannot accurately quote or produce an order without one, for anyone who receives, checks or assembles a tech pack: a merchandiser, a pattern maker, a costing clerk, or a new entrant to the trade. This lesson teaches information flow: a tech pack carries an order's exact requirements from the buyer to the factory floor, so every department works from the same facts instead of a guess.

A merchandiser at a garment factory checks a tech pack every time a new order arrives, before any fabric is bought, any pattern cut, or any price quoted.

Without this skill, a factory can start work from a partial document and be forced to guess the missing details. A guess about construction can produce a garment sewn the wrong way. A guess about sizing can produce a garment that does not fit. Knowing a tech pack's core sections, and checking all of them are present before quoting or cutting, is what turns a partial document into a specification a factory can trust.

03Before you start

What you need, and what this lesson does not cover

You need: no earlier lesson; this is the first lesson of this course.

By the end of this lesson you can:

  • name a tech pack's five core sections;
  • explain what makes a tech pack's bill of materials costable;
  • recognise a tech pack that is missing construction detail or grading rules;
  • decide whether an incomplete tech pack is ready for production;
  • record a tech pack's completeness on this course's own worksheet.

Not covered here: building a bill of materials in full (lesson T05-C05-L02); adding construction detail and a measurement spec (lesson T05-C05-L03); adding grading rules and packing instructions (lesson T05-C05-L04); assembling a complete tech pack (lesson T05-C05-L05).

04Key terms

Words you will meet in this lesson

TermMeaning
Tech packA document that specifies exactly what a garment is: measurements, fabric, trims, construction and artwork, that a factory produces against.
Measurement specThe document listing every point of measure for a garment, its required value at each size, and its accepted tolerance.
Grade ruleThe set amount added or removed at each specific point on a pattern, for each size step away from the base size.
Seam allowanceThe fabric width between a cut edge and a stitch line, commonly 1 cm (3/8 inch) for a plain seam, though it varies by construction.
Stitch classA standard international classification (ISO 4915) naming how a stitch is formed, such as class 301 lockstitch or class 401 chainstitch.
05Teaching
The rule

A tech pack is the complete document set a factory needs to make a garment

A tech pack is the complete document set a factory needs to make a garment: a bill of materials (every material and cost component, such as fabric, trims, making, overhead and profit), construction detail (stitch class, seam type, seam allowance per point), a measurement spec (every point of measure, its value at each size, and tolerance), grading rules (how the base size scales to every other size, using a grade rule), and labelling and packing instructions. A tech pack detailed enough that a factory can calculate an accurate cost from it, with no missing information forcing a guess, is a costable specification. Order A's own fixed identity — basic T-shirt, single jersey, 15,000 pieces, FOB USD 3.20 — is the real order whose tech pack this course assembles, one section at a time.

Bill ofmaterialsConstructiondetailMeasurementspecGradingrulesLabellingandpackingA complete tech pack, Order A's T-shirt
A tech pack has five core sections, and all five must be present before an order can be accurately quoted or produced. Missing any one section leaves a factory guessing at that part of the order.
What you meet in real life

The tech pack shapes a person actually meets, and why each matters

What can differThe shapes you meetWhy it matters
Complete tech packAll five sections present, each traceable to a fixed source: costing breakdown, construction convention, measurement spec, grade rule, packing figureA factory can quote, cut and produce with no missing information forcing a guess
Incomplete tech pack, missing construction detailBill of materials and measurements present, but no stitch class or seam type statedA factory has to guess construction methods, risking a garment built the wrong way
Incomplete tech pack, missing grading rulesBase size specified, but no rule stated for producing the other sizesA factory cannot cut a full size range accurately from a single base size alone
Costable vs non-costable bill of materialsA bill of materials detailed enough to calculate FOB is costable; one that just states "cotton T-shirt" with no material costs is notA factory cannot price a non-costable tech pack without guessing at cost components
Export MTO order, for example Order AA complete tech pack is assembled before the factory commits to a bulk quotation for an overseas buyerShows the same five-section standard applies whether the buyer is overseas or local
Domestic MTS order, for example Cedar & Co.'s own forecast ordersThe same five sections are still required, even when the factory itself sets some of the figures from its own standard block, rather than receiving all of them from an outside buyerShows the five-section standard holds across Make to Order and Make to Stock, and across export and domestic business
The case we follow

Delta Garments needs a complete tech pack before quoting Order A's T-shirt to Northline Apparel

Delta Garments' merchandising team, preparing an export Make to Order quotation for Order A's T-shirt, needs a complete tech pack before it can give Northline Apparel an accurate FOB quote, rather than an estimate based on assumptions. Mona, the merchandiser, checks the tech pack Northline Apparel has sent against the five core sections before her team commits to any figure.

If any section is missing, Mona cannot simply proceed with the sections that are present. A bill of materials alone tells her what the garment costs to make; it does not tell her how the garment is sewn or what size it must be at every point. Delta Garments' quotation, and later its production, depends on all five sections being present and consistent with each other.

The worked number

A complete bill of materials is what makes Order A's own fixed FOB figure calculable, rather than estimated

Order A's own fixed FOB breakdown (docs/02 section 7): fabric USD 1.15 + trims USD 0.20 + making USD 1.10 + overhead USD 0.49 + profit USD 0.26 = FOB USD 3.20. This is the concrete number a complete bill of materials, one section of the tech pack, makes possible to calculate accurately, rather than estimate.

Fabric + trims: 1.15 + 0.20 = 1.35 USD
Running total + making: 1.35 + 1.10 = 2.45 USD
Running total + overhead: 2.45 + 0.49 = 2.94 USD
Running total + profit: 2.94 + 0.26 = 3.20 USD
Fabric 1.15Trims 0.20Making 1.10Overhead 0.49Profit 0.26Order A's FOB, USD 3.20 per piece, one bill-of-materials line each
Order A's bill of materials lists five separate components summing to the fixed FOB of USD 3.20. A costable specification names each of these figures separately, not as one lump total.
The method

How to check a tech pack's completeness before quoting or starting production

  1. Confirm the bill of materials lists every material and cost component, each with its own figure, summing to the stated FOB.
  2. Confirm construction detail states stitch class, seam type and seam allowance for each construction point.
  3. Confirm the measurement spec gives every point of measure, its value at each size, and its tolerance.
  4. Confirm grading rules state how the base size scales to every other size in the range.
  5. Confirm labelling and packing instructions are stated for the care label, main label, polybag and carton marking.
  6. Flag the tech pack as not ready if any one of the five sections is missing, regardless of how detailed the other sections are.
The trap

A common mistake is treating a tech pack with a detailed bill of materials but no construction detail as "basically ready"

A common mistake is assuming a tech pack with a detailed bill of materials but no construction detail is "basically ready," since costing is the part buyers often focus on. A factory still needs construction detail to sew the garment correctly; skipping it risks a garment that costs the right amount but is built the wrong way.

This mistake happens because a detailed cost breakdown looks thorough at a glance, and it is often the section a buyer's team has spent the most time preparing. A merchandiser who only checks the bill of materials, and assumes the rest will "work itself out on the factory floor," passes the tech pack forward with a gap the pattern room and sewing line will meet directly, usually at the point construction actually starts, when correcting it costs more than catching it at intake would have.

06In plain words

A tech pack is the full set of papers a factory needs to make a garment correctly: what it costs, how it is sewn, what size it must be, how the sizes relate to each other, and how it is packed. If any one of these is missing, the factory has to guess that part, and a guess can mean a garment that costs the right amount but is sewn wrong, or fits wrong. A cost list detailed enough that a factory can work out an accurate price, with nothing left to guess, is a costable specification. Checking all five parts are present, every time, before any quote is given or any cutting starts, is what keeps a factory from building the wrong garment even when the price is right.

07Quick check
  • A tech pack has five core sections: bill of materials, construction detail, measurement spec, grading rules, and labelling/packing instructions.
  • A costable bill of materials is detailed enough that a factory calculates cost, rather than guessing at it.
  • A tech pack missing any one of the five sections is not ready for production, no matter how complete the other sections are.
  • A detailed bill of materials alone never proves construction detail or measurements are also complete.
  • The same five-section standard applies to export and domestic orders, and to Make to Order and Make to Stock business.
08Workplace scenario

A buyer sends Delta Garments a detailed bill of materials for Order A's T-shirt, with no measurement spec or grading rules at all

The facts in front of Delta Garments' merchandising team:

  • The buyer's document lists every cost component of Order A's T-shirt in detail: fabric, trims, making, overhead and profit, summing correctly to FOB USD 3.20.
  • The same document contains no measurement spec: no points of measure, no size-M values, no tolerances.
  • The same document contains no grading rules: no stated method for scaling the base size to S, L or XL.
  • Delta Garments has not yet started pattern making or production on this order.

The document Delta Garments' merchandising team reads:

Buyer's tech pack submission, Order A T-shirt, Section 1 of 3 — Bill of Materials: Fabric USD 1.15, Trims USD 0.20, Making USD 1.10, Overhead USD 0.49, Profit USD 0.26. Total FOB USD 3.20. [No further sections attached.]

Is this tech pack ready for Delta Garments to start pattern making and production? Decide before you open the answer.

Show decision

No — a detailed bill of materials allows accurate costing, but without a measurement spec and grading rules, Delta Garments' pattern room has no basis for cutting the garment to the correct size.

Two facts, together, decide this. First, the bill of materials is complete and costable: it sums correctly to Order A's own fixed FOB of USD 3.20. Second, the measurement spec and grading rules are both entirely absent, and pattern making cannot proceed on cost figures alone.

The buyer should be asked to complete these missing sections before production can start, even though the costing section alone looks thorough.

09What it costs

The scale of risk when production starts from a tech pack missing two of its five sections

Starting production from an incomplete tech pack risks a factory guessing at missing details, construction methods or sizing, producing garments that cost the right amount but fit or construct incorrectly, framed here qualitatively against the concrete USD 3.20 FOB figure as the anchor.

Fabric + trims: 1.15 + 0.20 = 1.35 USD
Running total + making: 1.35 + 1.10 = 2.45 USD
Running total + overhead: 2.45 + 0.49 = 2.94 USD
Running total + profit: 2.94 + 0.26 = 3.20 USD

The bill of materials in the buyer's submission gets this USD 3.20 figure right for every one of the 15,000 pieces. But a correct price on a garment that is the wrong size, because no measurement spec or grade rule was checked first, is not a saving; it is a real but not separately quantified cost this lesson's completeness check is designed to prevent, since a garment produced wrong still carries its full fabric, trim and labour cost.

10Working template

Tech pack template pack, Tech Pack Sections sheet: the completeness check this lesson fills

Copy this table into the Tech pack template pack. Mark each section complete or not, using Order A's own fixed figures as the source for each row.

Tech pack sectionFigures come fromCompleteNotes
Bill of materialsOrder A's own fixed FOB breakdownYes15,000-piece order
Construction detailCourse 2's own conventionsNoNot in the buyer's submission
Measurement specCourse 4's own size-M figuresNoNot in the buyer's submission
Grading rulesCourse 3's own grade ruleNoNot in the buyer's submission
Labelling and packingOrder A's own saving-package figureYesLabel, polybag, carton mark

Download the full working sheet from the link on this course's page.

Download the Tech pack template pack (Excel)

11Check yourself

1. What are the five core sections of a tech pack?

2. What makes a tech pack's bill of materials costable?

3. A different order's tech pack has a detailed bill of materials and complete construction detail, but no grading rules. Is it ready for production?

12Glossary
ENARFRTRMeaning
Tech packحزمة المواصفات الفنيةFiche techniqueTeknik paketA document that specifies exactly what a garment is: measurements, fabric, trims, construction and artwork, that a factory produces against.
Measurement specمواصفة القياسFiche de mesuresÖlçü spesifikasyonuThe document listing every point of measure for a garment, its required value at each size, and its accepted tolerance.
Grade ruleقاعدة التدريجRègle de gradationGradasyon kuralıThe set amount added or removed at each specific point on a pattern, for each size step away from the base size.
Seam allowanceسماحة الدرزةSurplus de coutureDikiş payıThe fabric width between a cut edge and a stitch line, commonly 1 cm (3/8 inch) for a plain seam, though it varies by construction.
Stitch classفئة الغرزةClasse de pointDikiş sınıfıA standard international classification (ISO 4915) naming how a stitch is formed, such as class 301 lockstitch or class 401 chainstitch.
13Next

Lesson 5.2: Building a bill of materials

You now know a tech pack's five core sections and why a tech pack missing any one of them is not ready for production. The next lesson builds the first of these sections in full: a bill of materials, using Order A's own fixed FOB breakdown as the worked example. Back to the course map

14Ladder

RecognizeName a tech pack's five core sections and what each one covers.
ConnectSee why a costable bill of materials makes Order A's own fixed FOB figure calculable rather than estimated.
CompareTell a complete tech pack from one missing construction detail or grading rules.
DecideJudge whether an incomplete tech pack is ready for pattern making and production.