Course contents
Practitioner · Course 5: Selling Capability and Winning Business · Lesson 4 of 4

Building a complete new-business pitch worksheet for a domestic trial order

Level: PractitionerTime: 45 minutesOrder used: Order A's T-shirt shape, a domestic Make to Order trial run for Cedar & Co.Tool: New-business pitch worksheet
For a merchandiser, owner or commercial staff member bringing lessons 5.1 to 5.3 together into one finished pitch. Lessons 5.1 to 5.3 are useful background, not required. The case is Cedar & Co. considering Delta Garments for a one-off domestic Make to Order trial run, before any move to its usual Make to Stock relationship.
FactoryDelta Garments, building a complete pitch
BuyerCedar & Co., domestic, one-off Make to Order trial
Order shapeT-shirt close to Order A, 60-day open account
QuestionHow buyer evaluation, capability and objection handling combine into one pitch
MethodCompleting all four worksheet sheets for one live order
ToolNew-business pitch worksheet
02Opening

This page explains how a factory combines buyer evaluation, capability presentation and price-objection handling into one complete pitch, for a merchandiser, owner or commercial staff member

This page explains how a factory combines buyer evaluation, capability presentation and price-objection handling into one complete pitch, for a merchandiser, owner or commercial staff member closing out a new-business worksheet on a live order. This lesson mainly teaches a decision flow: the three separate skills lessons 5.1 to 5.3 taught, reading what a buyer weighs, building a presentation around it, and answering an objection with real levers, come together as one worksheet a factory completes once. Mona and Karim meet this final step when Cedar & Co. considers a one-off Make to Order trial run with Delta Garments, close to Order A's own shape, before any move to its usual Make to Stock relationship.

A factory that treats the three as separate, disconnected tasks repeats work and risks contradicting itself between them. A factory that never brings them together into one record can lose track of what a buyer already knows, what it still needs to see, and what was already agreed on price. Without one finished worksheet, a factory answers each new question from memory instead of a record built for that buyer.

03Before you start

You need: lessons 5.1 to 5.3 are useful background, not required; access to the new-business pitch worksheet's four sheets is useful.

By the end of this lesson you can:

  • name the four worksheet sheets a complete pitch brings together;
  • state why completing all four for one order beats treating them as separate tasks;
  • read a mixed request, evaluation questions, a capability question and a price point together, and route each to its own sheet;
  • apply the new-business pitch worksheet's full set of sheets to Cedar & Co.'s trial order;
  • follow the method for completing a full pitch worksheet on a live order;
  • record a finished pitch entry on this course's working template.

Not covered here: the detailed method for each individual sheet, covered fully in lessons 5.1 to 5.3.

04Key terms

Words you will meet in this lesson

TermMeaning
Supplier qualificationThe process of checking a candidate factory's capacity, systems and compliance before placing an order with it.
Capability profileA document a factory prepares about itself, covering its machinery, capacity, certifications and product experience.
On-time delivery rateThe share of a supplier's past orders that arrived by their agreed date, used as a record of lead-time reliability.
Bulk discountA lower unit price a supplier offers for a larger purchase, often available only if payment is made promptly or in full.
Trial orderA small first order placed with a new supplier to test its capability before committing larger volume.
Hybrid productionA factory building part of a run to its own forecast before a buyer confirms it, and finishing the rest once the buyer's own order is confirmed.
05Teaching
The rule

A complete pitch worksheet holds a buyer's own weighted priorities, the presentation built around them, and any price-objection response together, in one record for one order

Lessons 5.1 to 5.3 each taught one piece: scoring what a buyer weighs, ordering a presentation around it, and answering a price objection with real, quantified levers instead of a straight discount. Each piece depends on the one before it, the presentation's order comes from the evaluation, and the objection response is judged against the same profit line the evaluation and presentation already respected. Keeping all three in one worksheet, rather than three separate documents, means a factory can show, in one place, exactly why it answered a specific buyer the way it did.

Three sheets, one worksheet, one orderBuyer ChecklistCapability ProfilePrice Objection LogEach sheet feeds the next; together they record one buyer's full evaluation, presentation and price answer
The three sheets from lessons 5.1 to 5.3 combine into one worksheet, completed for one order at a time. Each sheet's own entry depends directly on the sheet before it, not on a separate, disconnected record.
What you meet in real life

The shapes a complete pitch takes across export, domestic, and different business models

What can differThe shapes you meetWhy it matters
Export, Make to OrderNorthline Apparel's own worksheet entry runs from its capacity-and-lead-time-weighted evaluation, through a lead-time-led presentation, to no price objection at all if the first quotation already fits its calendar.Not every worksheet needs all three sheets completed with an objection response; a well-ordered presentation can close an order without one.
Domestic, Make to Order trialCedar & Co.'s worksheet entry for a one-off trial run close to Order A's own shape runs from an evaluation weighted toward on-time delivery, through a presentation led with that same figure, to a price point agreed without a formal objection since the trial's own smaller volume was priced accordingly from the start.A one-off trial order's worksheet entry is often shorter than a full relationship's, but still uses the same three sheets in the same order.
Export, through an agent, hybrid productionMeridian Sourcing's own worksheet entry for its European buyer's hybrid order runs through all three sheets in full, since the buyer's evaluation, the agent-forwarded presentation, and the price objection lesson 5.3 covered all belong to the same order.A hybrid, agent-mediated order is the shape most likely to need every sheet completed in full, since more parties and more production stages create more points needing a clear, single record.
Other product familiesA hosiery buyer's worksheet entry for Suez Hosiery runs the same three sheets, evaluation weighted toward linking and boarding quality, a presentation led with named fault rates, and any price objection answered with levers specific to hosiery production rather than T-shirt production.The specific facts change by product family; the worksheet's own three-sheet structure and order stay the same across every family.
The case we follow

Delta Garments completes all four sheets of the new-business pitch worksheet for Cedar & Co.'s one-off domestic trial order

Cedar & Co. considers a one-off, Make to Order trial run with Delta Garments, a T-shirt shape close to Order A, sold on 60-day open account, before any move to its usual Make to Stock relationship. Mona completes the Buyer Checklist sheet with Omar's own stated weights, then the Capability Profile sheet ordered around on-time delivery, then records that no price objection was raised since the trial's own smaller volume was priced accordingly from the first quotation, and finally completes the Pitch Summary sheet recommending the trial proceed.

The worked number

Completing the Pitch Summary sheet's own weighted total for Cedar & Co.'s trial order

Cedar & Co.'s own stated weights (illustrative) = on-time delivery 35% + compliance 25% + capacity 20% + price 20%
Delta Garments' on-time delivery score = 90 out of 100 (matching lesson 5.2's own 90% rate)
Delta Garments' compliance score = 85 out of 100
Delta Garments' capacity score = 90 out of 100
Delta Garments' price score = 80 out of 100 (trial-volume price accepted without objection)
On-time plus compliance parts = 31.5 + 21.25 = 52.75
Capacity plus price parts = 18 + 16 = 34
Pitch Summary weighted total = 52.75 + 34 = 86.75 out of 100
The Pitch Summary sheet's own weighted total: 86.75On-time 31.5Compliance 21.25Capacity 18Price 16All three earlier sheets feed this single number, recorded once on the Pitch Summary sheet
Cedar & Co.'s own Pitch Summary total, 86.75 out of 100, is built directly from the Buyer Checklist's own weights and the Capability Profile's own scores. No new figure is invented at this final step; the summary only combines what the earlier sheets already recorded.
The method

Completing a full pitch worksheet for one live order

  1. Complete the Buyer Checklist sheet first, recording the specific buyer's own weighted priorities, following lesson 5.1's method.
  2. Complete the Capability Profile sheet next, ordering the factory's facts around those same priorities, following lesson 5.2's method.
  3. Record any price objection and its answer on the Price Objection Log sheet, using real, quantified levers, following lesson 5.3's method, or record that none was raised.
  4. Complete the Pitch Summary sheet last, combining the three earlier sheets into one weighted total and a final recommendation.
  5. Check the summary against the factory's own profit line, confirming no earlier sheet's entry quietly cut into margin without a matching real lever.
  6. Keep the worksheet as the buyer's own record, updating it rather than starting a new one, for every later stage of the same relationship.
The trap

Treating the four worksheet sheets as separate, one-off tasks instead of one connected record for the same buyer and order

A common mistake is filling in one sheet, moving on, and starting the next buyer's evaluation from a blank sheet instead of checking whether the same buyer's earlier sheets already answered part of the question. As the worked number shows, the Pitch Summary sheet's own weighted total is only as useful as the Buyer Checklist and Capability Profile entries that feed it; treating them as disconnected loses that link entirely.

This trap costs real time and real consistency on every pitch it touches. A factory that re-asks a buyer questions its own Buyer Checklist sheet already answered, or that offers a price-objection lever inconsistent with what its own Capability Profile sheet already presented, can look disorganised to a buyer who is still deciding whether the factory is a reliable new supplier at all.

06In plain words

The three skills this course taught, reading what a buyer weighs, building a presentation around it, and answering a price objection with real reasons instead of a straight discount, are not three separate jobs. They are one connected record for one buyer and one order, completed on the same worksheet from start to finish. Filling in the buyer's own priorities first, then a presentation built around them, then any price answer built from real levers, then a final summary that combines all three, gives a factory one place to see exactly why it approached a specific buyer the way it did. Keeping that one record, rather than starting fresh each time a question comes in, is what turns three separate lessons into one repeatable way of winning new business.

07Quick check
  • A complete pitch worksheet holds a buyer's evaluation, the presentation built around it, and any price-objection answer together.
  • Not every order needs all three sheets completed with a formal objection response.
  • The Pitch Summary sheet combines the earlier sheets into one weighted total, without inventing a new figure of its own.
  • A one-off trial order's worksheet entry can be shorter than a full relationship's, but follows the same order of sheets.
  • Treating the four sheets as disconnected tasks risks re-asking questions already answered or contradicting an earlier presentation.
  • Keeping one worksheet per buyer, updated over time, beats starting a new one for every later stage of the relationship.
08Workplace scenario

Mona must decide whether Cedar & Co.'s trial order is ready to proceed based on the completed pitch worksheet

Mona has completed all four sheets of the new-business pitch worksheet for Cedar & Co.'s one-off trial order. The facts in front of her:

  • The Buyer Checklist sheet records Omar's own weights, on-time delivery 35%, compliance 25%, capacity 20%, price 20%.
  • The Capability Profile sheet, ordered around on-time delivery first, was sent and Omar responded positively, inviting a trial order.
  • The Price Objection Log sheet records no objection was raised, since the trial's smaller volume was priced accordingly from the first quotation.
  • The Pitch Summary sheet's weighted total is 86.75 out of 100, built entirely from the three earlier sheets.

The document Mona reads, the completed Pitch Summary sheet's own recommendation line:

Pitch Summary, Cedar & Co. trial order. Weighted total: 86.75 out of 100. Buyer Checklist: complete. Capability Profile: sent and positively received. Price Objection Log: no objection raised. Recommendation: proceed to trial order.

Should Mona proceed to confirm the trial order based on this completed worksheet, or hold and request a formal price objection review first, since none was recorded? Decide before you open the answer.

Show decision

She should proceed to confirm the trial order. Every sheet in the worksheet is complete and consistent, the weighted total is strong, and the absence of a price objection is itself a recorded fact, not a missing step, since the trial's own price was set to fit the buyer's evaluation from the start.

Two facts, together, decide this. First, the Buyer Checklist and Capability Profile sheets are both complete and consistent with each other, Omar's own stated priorities match what the presentation led with, and he responded positively. Second, the Price Objection Log sheet's own entry, no objection raised, is a valid, recorded outcome under this course's method, not an incomplete step requiring a separate review before proceeding.

Holding the order to request a price objection review that was never raised would add delay without adding information, since lesson 5.3's own method treats "no objection raised" as a complete, valid entry once the reason is recorded, exactly as this worksheet already has.

09What it costs

The value of a complete, connected pitch worksheet against the cost of treating its four sheets as separate tasks

This lesson's cost is the value of the domestic relationship this pitch worksheet is built to win. A T-shirt line close to Order A's own shape carries a profit margin of USD 0.26 per piece; a trial run of 15,000 pieces sold domestically to Cedar & Co. is worth USD 3,900 in margin (15,000 x USD 0.26), and a successful trial can lead to the same repeat-order relationship lesson 5.2 described. A disconnected approach that re-asks questions the Buyer Checklist sheet already answered, or offers a price lever inconsistent with the Capability Profile sheet, risks the buyer reading the factory as disorganised at exactly the moment it is deciding whether to trust it with that first USD 3,900 trial order, and every reorder that would have followed it.

10Working template

New-business pitch worksheet: completing the Pitch Summary sheet for a finished pitch

Copy this row into the new-business pitch worksheet's Pitch Summary sheet, once the Buyer Checklist, Capability Profile and Price Objection Log sheets are complete for the order.

Check pointSpec saysFound (your entry)Result
The combined weighted total and final recommendation for the buyer and order you enterCombine the three earlier sheets' own entries into one weighted total and one recommendation, in the Pitch Summary sheet

Download the full working sheet, with Cedar & Co.'s trial order already filled in across all four sheets, from the link on this course's page.

Download the New-business pitch worksheet (Excel)

11Check yourself

1. According to this lesson, what does the Pitch Summary sheet's weighted total come from?

2. A buyer's own weights are on-time delivery 40%, compliance 30%, capacity 15%, price 15%. A factory scores 90, 80, 70 and 60 on each. What is the weighted total?

3. A different buyer weighs on-time delivery 30%, compliance 30%, capacity 25%, price 15%, and scores a factory 100, 90, 80 and 70. What is the weighted total?

12Glossary
ENARFRTRMeaning
Supplier qualificationتأهيل المورّدQualification du fournisseurTedarikçi niteliklendirmesiThe process of checking a candidate factory's capacity, systems and compliance before placing an order with it.
Capability profileملف القدراتProfil de capacitéYetkinlik profiliA document a factory prepares about itself, covering its machinery, capacity, certifications and product experience.
On-time delivery rateمعدل التسليم في الموعدTaux de livraison à tempsZamanında teslimat oranıThe share of a supplier's past orders that arrived by their agreed date, used as a record of lead-time reliability.
Bulk discountخصم الكميةRemise sur volumeToplu alım indirimiA lower unit price a supplier offers for a larger purchase, often available only if payment is made promptly or in full.
Trial orderطلبية تجريبيةCommande d'essaiDeneme siparişiA small first order placed with a new supplier to test its capability before committing larger volume.
Hybrid productionالإنتاج الهجينProduction hybrideHibrit üretimA factory building part of a run to its own forecast before a buyer confirms it, and finishing the rest once the buyer's own order is confirmed.
13Next

This is the last lesson in Course 5

Course 5 ends here. You can now read what a buyer weighs, build a capability presentation around it, answer a price objection with real levers, and complete one worksheet holding all three for a live order. Back to the course map

14Ladder

RecognizeName the four worksheet sheets a complete pitch brings together.
ConnectSee how each sheet's entry depends directly on the sheet completed before it.
CompareTell why a one-off trial order's worksheet entry can be shorter but still follows the same order.
DecideComplete all four sheets for a live order before deciding whether to proceed.