Course contents
Practitioner · Course 3: Calculate Trims, Processes and CM · Lesson 3 of 5

Turning an SMV into a cut-make-trim (CM) labour cost

Level: PractitionerTime: 45 minutesOrder used: A (the T-shirt)Tool: Trims, process and CM cost sheet calculator
This lesson needs lesson 8.1.3's full SMV table for Order A. No other T12 lesson is required first. Money figures are teaching examples; at work, use your own factory's own labour rate.
FactoryDelta Garments (garment factory)
BuyerNorthline Apparel (overseas clothing brand)
Order A's total SMV2.62 minutes per piece (fixed, from lesson 8.1.3)
Order A's making costUSD 1.10 per piece (fixed)
Derived labour rateAbout USD 0.42 per minute (1.10 divided by 2.62)
Business modelMake to Order (MTO), a single confirmed export order
02Opening

This page is for anyone who needs to turn a garment's SMV into its own cut-make-trim labour cost

This page teaches the money flow that connects a work-study specialist's SMV table to a merchandiser's costing sheet. Lesson 8.1.3 built Order A's full SMV table, five operations adding to 2.62 minutes per piece, but a minute figure alone is not a dollar figure. A factory turns SMV into a labour cost by multiplying it by a labour rate per minute, and that single multiplication is the bridge between work study and costing.

This matters to Delta Garments' merchandiser every time an SMV table changes, since a revised SMV must flow through to a revised labour cost, and to its share of the whole quoted price, without anyone needing to rebuild the costing sheet from scratch.

03Before you start

What you need, and what this lesson does not cover

You need: lesson 8.1.3's full SMV table for Order A (five operations, 2.62 minutes total), and the idea of a formula-driven costing sheet from lesson 7.2.

By the end of this lesson you can:

  • explain what a labour rate per minute is and where it comes from;
  • derive a labour rate per minute from an already-known SMV and an already-known making cost;
  • multiply a garment's total SMV by its labour rate to build its CM labour cost;
  • allocate a garment's CM labour cost back across its own individual operations;
  • explain why a derived labour rate is not a new fixed fact, but a calculation from two already-fixed figures.

Not covered here: trims and wet processes, already covered in lessons 12.3.1 and 12.3.2, and adding overhead and profit on top of CM (lesson 12.3.4).

04Key terms

Words you will meet in this lesson

TermMeaning
Standard minute value (SMV)The standard time, in minutes, a trained operator needs to complete one operation on one piece, used to calculate a line's expected output and workload.
Making chargeThe labour cost of cutting, sewing and finishing one garment, often called CM (cut-make) on a factory's own cost sheet.
CMT (cut, make and trim)The buyer supplies the fabric; the factory is paid only for cutting, sewing and finishing.
05Teaching
The rule

A garment's CM labour cost is its total SMV multiplied by a labour cost per minute, never a figure guessed on its own

Every garment's total SMV, built up operation by operation, becomes a dollar labour cost only once it is multiplied by a labour rate per minute. That rate itself comes from the factory's own real labour cost, benefits and running time, but once known, it applies consistently across every operation and every garment on the same line. A CM figure quoted without reference to any SMV or labour rate cannot be checked or defended; a CM figure built from SMV times rate can be traced back to both.

2.62 minutes × 0.42 per minute = 1.10
SMV 2.62 minRate 0.42/minCM 1.10Minutes only become a dollar labour cost once multiplied by the rate.
A time figure and a rate multiply into a dollar figure. Neither the SMV alone nor the rate alone is a labour cost; only their product is.
What you meet in real life

The same multiplication applies to every garment, but where the labour rate itself comes from differs

What can differThe shapes you meetWhy it matters
A labour rate already known from the factory's own recordsA factory that already tracks its total labour cost per minute across its line applies that known rate directly to any new garment's SMV.The rate is a real, measured fact from the factory's own payroll and output, not derived from any one order.
A labour rate derived from an already-fixed making costWhere only a garment's total SMV and its already-agreed making cost are known, as with Order A (2.62 minutes and USD 1.10), a labour rate can be derived by dividing one by the other.The derived rate, about USD 0.42 per minute, is not a new fact; it is a calculation from two figures already fixed elsewhere, and should be labelled as a derivation, not an independent measurement.
Export orders where a buyer expects CM to trace to SMVAn export buyer such as Northline Apparel expects the making-cost share of a quoted FOB price to trace back to the underlying SMV table, not stand alone as a round number.A CM figure without a traceable SMV and labour rate behind it cannot be defended if a buyer questions the making cost.
A domestic brand's own workforce costingCedar & Co., planning its own domestic run in the identical T-shirt style, uses the identical SMV table and the identical labour-rate method to reach its own CM figure, even though no external buyer will audit it.The method for turning SMV into CM does not change with who reads the resulting figure.
A more complex garment with a longer operation sequenceA garment with more operations has a higher total SMV, and therefore a higher CM at the same labour rate, without any change to the rate itself.More operations change the SMV total, and therefore the CM total; the multiplication method stays the same.
The case we follow

Delta Garments' merchandiser derives Order A's labour rate per minute, then rebuilds its CM from the SMV table operation by operation

Mona, the merchandiser at Delta Garments, already has two fixed figures for Order A: its total SMV of 2.62 minutes, from lesson 8.1.3's own build-up table, and its already-agreed making cost of USD 1.10 per piece, from the order's own costing sheet. She derives a labour rate per minute by dividing 1.10 by 2.62, giving about USD 0.42 per minute, and then checks that this rate, applied back to each individual operation's own SMV, reconstructs the same USD 1.10 total.

FactWhat it tells Mona
Order A's total SMV is 2.62 minutes, already fixedThis is the multiplier her labour rate must apply to
Order A's making cost is USD 1.10 per piece, already fixedDividing this by the SMV derives the labour rate, rather than inventing one
The derived rate, about USD 0.42 per minute, is not itself a new fixed factIt is a calculation Mona can show her working for, not a separate figure to defend on its own
Applying the derived rate to each operation's own SMV should reconstruct the same USD 1.10 totalThis checks that the derivation is consistent, not just convenient

Deriving the rate once, from two already-fixed figures, lets Mona apply the identical rate to any future garment sewn on the same line, as long as the line's real labour cost has not itself changed.

The worked number

Order A's CM labour cost, built operation by operation from its own SMV table and the derived labour rate

Shoulder join: 0.41 × 0.42 = 0.1722
Sleeve attach: 0.62 × 0.42 = 0.2604
Neck rib attach: 0.72 × 0.42 = 0.3024
Side seam: 0.50 × 0.42 = 0.2100
Hem: 0.37 × 0.42 = 0.1554
0.1722 + 0.2604 = 0.4326
0.4326 + 0.3024 = 0.7350
0.7350 + 0.2100 = 0.9450
0.9450 + 0.1554 = 1.1004

Rounded to two decimal places, 1.1004 gives Order A's own fixed CM of USD 1.10 per piece, confirming the derived labour rate of USD 0.42 per minute is consistent with both the SMV table and the already-fixed making cost.

0.170.260.300.210.16Shoulder · Sleeve · Neck rib · Side seam · Hem, left to right, each sized to its own share of the USD 1.10 CM total.
Neck rib attach carries the largest single share of the CM labour cost, about USD 0.30 of the USD 1.10 total. The same operation that carried the largest SMV share in lesson 8.1.3 carries the largest labour-cost share here, since both are built from the same SMV figures.
The method

Turn a garment's SMV into its own CM labour cost in five steps

  1. Get the garment's own total SMV from its full SMV table, built the way lesson 8.1.3 shows.
  2. Get or derive a labour rate per minute: from the factory's own known labour cost per minute, or, where only an already-fixed making cost exists, by dividing that making cost by the total SMV.
  3. Multiply each operation's own SMV by the labour rate to find that operation's own labour cost.
  4. Add every operation's own labour cost into the garment's total CM labour cost.
  5. Check the total against any already-fixed making cost for the order, and label a derived rate clearly as a derivation, not a new independent fact.
The trap

A common mistake is treating a derived labour rate as a new fixed fact instead of a calculation that depends on the figures it came from

A common mistake is deriving a labour rate once, from an SMV and a making cost, and then treating that rate as a permanent, independently fixed fact rather than a calculation tied to the two figures it came from. If the garment's own SMV is later revised, for example after an SMV audit corrects one operation's allowance, a labour rate derived from the old SMV no longer matches the factory's real labour cost, and reapplying it to the new SMV produces a CM figure that no longer reconciles with anything real. A derived rate needs to be re-derived, or replaced with the factory's own measured rate, whenever the figures behind it change.

06In plain words

A garment's sewing cost in minutes, its SMV, is not yet a cost in dollars. To turn minutes into dollars, you multiply the SMV by how much one minute of sewing time actually costs. Sometimes a factory already knows this dollar-per-minute rate from its own records. Sometimes you only know the total minutes and the total dollars already agreed for a garment, and in that case you can work out the rate by dividing the dollars by the minutes. That worked-out rate is not a new fact on its own; it only holds true as long as the two numbers it came from stay true.

07Quick check
  • A garment's CM labour cost is its total SMV multiplied by a labour rate per minute.
  • A labour rate can come from a factory's own known records, or be derived from an already-fixed SMV and making cost.
  • A derived labour rate is a calculation, not an independent new fact, and needs re-deriving if either figure behind it changes.
  • Applying the labour rate operation by operation should reconstruct the garment's total CM, as a consistency check.
  • The method for turning SMV into CM does not change between an export order and a domestic brand's own run.
  • A CM figure with no traceable SMV or labour rate behind it cannot be defended if questioned.
08Workplace scenario

Sara at Northline Apparel asks Mona to show where Order A's USD 1.10 making cost actually comes from

Sara, the buyer at Northline Apparel, is reviewing Order A's costing sheet before final approval and notices the making cost is listed as USD 1.10 per piece with no supporting detail. She asks Mona to show the calculation behind it.

  • Order A's full SMV table, already built in lesson 8.1.3, gives a total SMV of 2.62 minutes per piece.
  • Delta Garments' merchandiser derived a labour rate of about USD 0.42 per minute from the already-fixed making cost and total SMV.
  • Applying that rate operation by operation reconstructs the same USD 1.10 total, confirming the figures are consistent.

Sara's message reads:

"The making cost just says USD 1.10. Where does that number actually come from? Can you show me the build-up?"

Can Mona answer Sara's question using only the SMV table and the labour rate, or does she need a new number she does not already have?

Show decision

Mona can answer fully using only figures she already has; no new number is needed.

First, the SMV table already exists. Lesson 8.1.3's own build-up table already gives every operation's own SMV and the 2.62-minute total, with no further work needed to obtain it.

Second, the labour rate is a derivation, not a new fact. Dividing the already-fixed USD 1.10 making cost by the already-fixed 2.62-minute total SMV gives about USD 0.42 per minute, a calculation Mona can show step by step rather than a number she has to separately justify.

Mona should show Sara the full operation-by-operation build-up: each operation's own SMV multiplied by the USD 0.42 rate, summing back to the USD 1.10 total, proving the making cost is not an arbitrary round figure but a traceable calculation from the factory's own SMV table.

09What it costs

The cost of quoting a making cost with no SMV or labour rate behind it, then being unable to defend it

Framed against Order A's own 15,000-piece order, a making cost of USD 1.10 per piece with no supporting SMV or labour rate gives Delta Garments no way to answer a buyer's challenge, and no way to check whether a future SMV revision should actually change the price at all.

1.10 × 15,000 = 16,500.00

If Sara's question in this lesson's scenario had gone unanswered, Northline Apparel could reasonably suspect the USD 16,500.00 making-cost total for the whole order was padded, undermining Delta Garments' credibility on every other line of the costing sheet as well, a reputational cost that a traceable SMV-to-CM build-up avoids entirely.

10Working template

Trims, process and CM cost sheet calculator: fill the SMV-to-CM sheet to see the labour rate and CM total calculated for you

Open the Trims, process and CM cost sheet calculator. On its SMV-to-CM sheet, enter the garment's own total SMV; the labour rate per minute calculates automatically from the making cost you enter, and the CM labour cost per piece calculates automatically from the SMV and the rate. Check that the calculated CM matches any already-fixed making cost for the order before accepting the sheet.

[Download the Trims, process and CM cost sheet calculator](../../templates/T12-C03-trims-process-cm-cost-sheet-calculator.xlsx)

Download the Trims, process and CM cost sheet calculator (Excel)

11Check yourself

1. How is a garment's CM labour cost calculated from its SMV?

2. A garment has a total SMV of 3.00 minutes and an already-fixed making cost of USD 1.20 per piece. What is the derived labour rate per minute?

3. Why is a labour rate derived from an SMV and a making cost not treated as a new, independent fixed fact?

12Glossary
ENARFRTRMeaning
Standard minute value (SMV)قيمة الدقيقة المعيارية (SMV)Valeur minute standard (SMV)Standart dakika değeri (SMV)The standard time, in minutes, a trained operator needs to complete one operation on one piece, used to calculate a line's expected output and workload.
Making chargeتكلفة التصنيعCoût de façonİşçilik (fason) maliyetiThe labour cost of cutting, sewing and finishing one garment, often called CM (cut-make) on a factory's own cost sheet.
CMT (cut, make and trim)تشغيل فقط: قص وخياطة على قماش المشتريFaçon (CMT)Fason (CMT)The buyer supplies the fabric; the factory is paid only for cutting, sewing and finishing.
13Next

Lesson 12.3.4: Adding overhead and profit on top of CM to reach a factory's asking price

You can now turn a garment's SMV into its own CM labour cost. The next lesson adds overhead and profit on top of CM and trims to reach the factory's full asking price. Back to the course map

14Ladder

RecognizeName what a garment's CM labour cost is calculated from.
ConnectSee why a derived labour rate depends on the SMV and making cost it came from.
CompareTell a CM figure built from SMV and rate from one quoted with no supporting build-up.
DecideJudge whether a derived labour rate needs re-deriving after an SMV changes.