Course contents
Practitioner · Course 2: AQL and Final Inspection · Lesson 5 of 5

Building a complete AQL final inspection report for a shipment

Level: PractitionerTime: 45 minutesOrder used: A (the T-shirt)Tool: AQL final inspection report builder
This lesson is for a quality inspector, a merchandiser, or a buyer who needs to assemble everything this course covered into one complete report. Lessons 9.2.1 to 9.2.4 are assumed. The batch quantity is an illustrative teaching figure.
BuyerCedar & Co. (domestic brand, buying from Delta Garments)
SupplierDelta Garments, on 60-day open account
Batch inspected4,000 T-shirts, illustrative domestic stock batch
Report sectionsSampling plan, defect tally, and signed overall result
Standard referencedCedar & Co.'s own AQL standard for domestic stock
Output of this lessonOne complete, signed inspection report Cedar & Co. can act on
02Opening

This page explains how to assemble a lot's sampling plan, its defect tally, and its overall result into one complete, signed AQL final inspection report

This page is for anyone who has run every individual step this course covers and now needs to put them in one place a buyer can actually rely on, because a scattered set of notes, however accurate each one is, is not the same as one signed document that states what was inspected, how, and with what result.

This matters most to a quality inspector or a merchandiser, since a buyer such as Cedar & Co., receiving a domestic stock batch from Delta Garments, needs one report it can act on quickly: accept the batch, ask for a rework, or reject it, without having to reconstruct the inspection from separate scraps of paper.

Without one complete report, a factory can genuinely have done a correct inspection yet fail to prove it, and a buyer can be left guessing whether an inspection even followed the agreed method.

03Before you start

What you need, and what this lesson does not cover

You need: lessons 9.2.1 to 9.2.4, since this lesson assembles what they each covered rather than teaching a new rule.

By the end of this lesson you can:

  • list the sections a complete AQL final inspection report needs;
  • carry a lot's sampling plan, its defect tally, and its overall result into one report without contradiction;
  • explain why an overall result must show its own working, not just a pass/fail word;
  • recognise what a sign-off adds that the numbers alone do not;
  • avoid the common mistake of treating a filled-in defect tally as if it were already a complete report.

Not covered here: any new AQL rule; this lesson only assembles what lessons 9.2.1 to 9.2.4 already established.

04Key terms

Words you will meet in this lesson

TermMeaning
Final inspection reportThe single document that records a lot's identity, its sampling plan, its defect tally, and its signed overall result, so a buyer can act on it without further questions.
Sign-offA named person's confirmation, with their name and the date, that they reviewed the inspection and accept its recorded result.
Lot sizeThe total quantity of finished goods in the shipment or batch being inspected, before any sample is drawn from it.
Inspection sample sizeThe exact number of pieces an AQL inspection pulls from a lot, read from the sampling table using the lot's own size and the inspection level.
Acceptance numberThe largest number of defects of one class a sample may contain while the whole lot still passes.
05Teaching
The rule

A complete final inspection report carries one lot from its own identity, through its sampling plan and defect tally, to one signed overall result

No single number proves an inspection was done correctly; the report as a whole does. A complete report states the lot's identity (what it is, how many pieces), the sampling plan used (lot size, sample size, acceptance and rejection numbers per class), the defect tally actually found (per class, compared to its own numbers), and one overall result, signed by a named person, that follows directly from everything recorded above it. Each section depends on the one before it; skipping any one leaves the final result unsupported.

Lot identitySampling planDefect tallySignedresultEach section depends on the one before it; the signed result at the end follows from everything recorded above it.
A complete report carries one lot through four sections, each depending on the one before it. A signed result with no sampling plan or defect tally behind it proves nothing, however confident it sounds.
What you meet in real life

A report's sections stay the same, but who signs it, and what triggers it, differs by order shape

A person who has only filled in one kind of report should not assume every report is triggered and signed the same way. What differs is who is involved and when the report is produced, not its four sections.

What can differThe shapes you meetWhy it matters
An export order with a buyer's own inspection agentOn an order like Order B (jeans), a buyer's own agent, such as Meridian Sourcing, signs the report on the buyer's behalf, and the factory's own quality team signs separately as the party that ran the inspection.Two signatures, not one, are often needed: the party that inspected, and the party that accepts the result on the buyer's behalf.
A domestic batch with no outside buyer's agentOn a domestic Make to Stock batch like Cedar & Co.'s own stock from Delta Garments, Cedar & Co.'s own quality lead may be the only signer, since no separate buyer's agent is involved.The report's four sections are unchanged; only the number and identity of the people signing differs.
A report triggered by a scheduled shipment dateMost reports are produced once, at final inspection, timed to a confirmed shipment or delivery date.The report's sampling plan and defect tally reflect the lot as inspected on that date, not an average across multiple partial checks.
A report needed again after a reworkFollowing lesson 9.2.4's rework or re-sort, a second, separate report is produced for the corrected lot, referencing the first report's fail rather than replacing it.A corrected lot's pass is recorded honestly as following a fail and a fix, not written as if the lot had passed cleanly the first time.
The case we follow

Cedar & Co. receives Delta Garments' complete final inspection report for a 4,000-piece domestic stock batch before accepting it into its own shops

Cedar & Co. buys finished T-shirts from Delta Garments on a 60-day open account, for its own shops, to its own forecast. Before an illustrative batch of 4,000 T-shirts is accepted into Cedar & Co.'s own stock, Delta Garments' quality team assembles one complete final inspection report, covering the batch's own identity, the sampling plan applied under Cedar & Co.'s own AQL standard, the defect tally actually found (as in lesson 9.2.3's own critical, major and minor faults), and one signed overall result.

FactWhat it tells the report's assembler
The batch is 4,000 pieces, an illustrative domestic stock quantityThe report's lot identity section states this size plainly, not Order A's size
Cedar & Co. sets its own AQL standard, with its own acceptance numbers per classThe sampling plan section records Cedar & Co.'s own numbers, not a buyer-agent's
The defect tally found one critical, one major and one minor fault (lesson 9.2.3's own example)The tally section carries these counts forward exactly, against their own acceptance numbers
No outside buyer's agent is involved in this domestic batchCedar & Co.'s own quality lead is the report's signer, not a separate agent

Cedar & Co. buying on its own forecast rather than under one confirmed export contract is exactly why its own quality lead's signature, not an outside agent's, is what turns this report into a document Cedar & Co. can act on.

The worked number

How the batch's own sampling plan and defect tally carry forward into one overall result

This example reuses lesson 9.2.3's own illustrative tally: a minor loose thread (1, against an acceptance number greater than 1), a major skipped stitch (1, against an acceptance number greater than 1), and one critical needle fragment (1, against an acceptance number of 0). The report's overall result section states the batch fails, because the critical tally's single fault already exceeds its own acceptance number of zero, regardless of the minor and major tallies both individually passing.

Critical: FAIL1 found, Ac 0exceeds acceptance numberMajor: PASS1 found, under its AcMinor: PASS1 found, under its AcOverall result: FAIL. One class failing is enough, whatever the other two classes show.
The report's overall result is FAIL, driven entirely by the critical tally, even though major and minor both pass individually. The report shows this working plainly, not just the single word "fail," so the buyer sees exactly why.
The method

How to assemble a complete AQL final inspection report

  1. State the lot's own identity: what it is, its exact size, and the order or batch it belongs to.
  2. Record the sampling plan: the sample size, and the acceptance and rejection numbers for each defect class, from the sampling table.
  3. Record the defect tally actually found, per class, alongside each class's own acceptance number for direct comparison.
  4. State the overall result, showing which class (if any) failed and why, not only the word "pass" or "fail."
  5. Sign the report, with a named person and a date, confirming the result stands as recorded.
The trap

Treating a filled-in defect tally as if it were already a complete, actionable report

A common mistake is stopping at a filled-in tally sheet and calling the inspection done, without stating the lot's own identity, the sampling plan it was judged against, or a signed overall result. A buyer handed only a tally sheet has to ask which lot it belongs to, what sample size was used, and who stands behind the result, questions a complete report would have already answered.

06In plain words

A finished inspection is not just a list of faults found. It is one document that says which batch was checked, how many pieces were sampled and by what rule, what faults were found and how they compare to the allowed limits, and one final answer, signed by a real person, on whether the batch passes. Leaving out any of these leaves the buyer unable to act on the inspection with confidence, even if every number in it happens to be correct.

07Quick check
  • A complete report has four parts: lot identity, sampling plan, defect tally, and a signed overall result.
  • The overall result must show which class failed and why, not just a bare pass or fail word.
  • An export order often needs two signatures: the inspecting party and the buyer's own accepting agent.
  • A domestic batch with no outside buyer's agent can be signed by the seller's own quality lead alone.
  • A report produced after a rework references the original fail rather than hiding it.
  • A tally sheet alone, without identity, plan, and a signed result, is not yet a complete report.
08Workplace scenario

Cedar & Co.'s shop manager wants to accept the batch on the strength of the tally sheet alone, without waiting for the signed report

Delta Garments' quality team has finished counting defects on the 4,000-piece batch and sends Cedar & Co.'s shop manager the filled-in tally sheet. The shop manager, keen to get the batch onto shelves, asks whether the tally sheet alone is enough to accept the batch, since "the numbers are all there."

  • The tally sheet shows one critical, one major and one minor fault found, with no acceptance numbers written alongside them.
  • No lot identity section, sampling plan, or signed overall result accompanies the tally sheet yet.
  • Delta Garments' quality lead has not yet signed anything confirming the batch's result.

The shop manager's note reads:

"The tally sheet shows the faults found. Can we accept the batch now and get the signed report later?"

Should Cedar & Co. accept the batch on the strength of the tally sheet alone, before the complete signed report is ready.

Show decision

No. A tally sheet without its lot identity, sampling plan, and a signed overall result is not yet a complete report, and the critical fault it shows already fails the batch once compared to its own acceptance number.

First, the tally sheet alone does not show the acceptance numbers each count must be compared to. Without the sampling plan section, nobody reading only the tally sheet can confirm whether one critical fault actually fails the batch, even though, in this case, it does.

Second, no one has yet signed a stated overall result. A number on a page is not the same as a named person's confirmation that they reviewed it and stand behind it.

Cedar & Co. should wait for Delta Garments' complete, signed report, which will show the critical tally failing against its own acceptance number of zero, and should not accept the batch into its shops on the strength of an unsigned, partial tally sheet.

09What it costs

The cost of accepting a batch into shops before its complete report actually confirms a pass

If Cedar & Co. had accepted the batch on the tally sheet alone, it would have shelved stock containing a genuine critical fault (a needle fragment), a safety risk the complete, signed report would have caught and stopped before the batch ever left Delta Garments.

1 unsigned, incomplete tally sheet accepted early = a critical safety fault reaching Cedar & Co.'s own shops undetected, instead of being stopped at the factory

The cost of a safety incident reaching a customer, including the harm itself, the return, and the damage to Cedar & Co.'s own reputation with its shop customers, is far larger than the short wait for one complete, signed report.

10Working template

AQL final inspection report builder: see all three sheets working together as one report

Open the AQL final inspection report builder and look at all three sheets in sequence: the Sampling Plan sheet (lot identity and sampling numbers), the Defect Tally sheet (faults found, compared to acceptance numbers), and the Final Inspection Report sheet (the overall result and sign-off fields). This is the complete report this whole course has been building toward, one sheet at a time.

Download the AQL final inspection report builder (Excel)

11Check yourself

1. What four sections does a complete inspection report need?

2. A batch has zero critical and zero major defects, with a minor tally of 30 against an acceptance number of 34. What should the report's overall result state?

3. Why does an export order like Order B (jeans) often need two signatures, while a domestic batch may need only one?

12Glossary
ENARFRTRMeaning
Final inspection reportتقرير الفحص النهائيRapport d'inspection finaleNihai kontrol raporuThe single document that records a lot's identity, its sampling plan, its defect tally, and its signed overall result, so a buyer can act on it without further questions.
Sign-offالتوقيع بالاعتمادValidation signéeOnay imzasıA named person's confirmation, with their name and the date, that they reviewed the inspection and accept its recorded result.
Lot sizeحجم الدفعةTaille du lotParti büyüklüğüThe total quantity of finished goods in the shipment or batch being inspected, before any sample is drawn from it.
Inspection sample sizeحجم عينة الفحصTaille d'échantillon d'inspectionKontrol numune büyüklüğüThe exact number of pieces an AQL inspection pulls from a lot, read from the sampling table using the lot's own size and the inspection level.
Acceptance numberرقم القبولNombre d'acceptationKabul sayısıThe largest number of defects of one class a sample may contain while the whole lot still passes.
13Next

Course complete

This is the last lesson of Course 2. You can now run an AQL final inspection end to end: sample, count, decide, and record the result in one report a buyer can act on with confidence. Back to the course map

14Ladder

RecognizeName the four sections a complete AQL final inspection report needs.
ConnectSee how lessons 9.2.1 to 9.2.4 each feed one section of the same report.
CompareTell a complete, signed report from a bare tally sheet.
DecideRefuse to accept or ship a lot on a partial report missing its identity, plan, or signature.